Vial Stair Project

In early February 2020, we built five sets of steps that we installed around Vial Camp, as well as arranging for the installation of a metal handrail. There were a series of shelters positioned above a wall that were difficult to access. We hope this will help ease access to these shelters for camp residents, as well as minimize the possibility of injury.